{"id":12866,"date":"2024-02-10T16:30:00","date_gmt":"2024-02-10T11:00:00","guid":{"rendered":"https:\/\/www.saasworthy.com\/blog\/?p=12866"},"modified":"2024-08-05T15:20:49","modified_gmt":"2024-08-05T09:50:49","slug":"key-milestones-in-project-management","status":"publish","type":"post","link":"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management","title":{"rendered":"A Detailed Guide on Key Milestones in Project Management"},"content":{"rendered":"\n<p>The role of a project manager is not an easy one. They need to focus on various aspects of a project, and often things can go wrong if they are not adept at multi-tasking or taking note of key elements of the project. Many project managers tend to break their projects into smaller segments which makes it easier for them to monitor and track all the progress. When each of these segments is achieved, it is nothing short of achieving a key milestone in the project.<\/p>\n\n\n\n<p>In this post, we will look at a project milestone, some of its benefits, examples of project milestones, and best practices to follow while creating project milestones.<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_17 counter-hierarchy counter-decimal ez-toc-grey\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><\/span><\/div>\n<nav><ul class=\"ez-toc-list ez-toc-list-level-1\"><li class=\"ez-toc-page-1 ez-toc-heading-level-2\"><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management\/#What_is_a_Project_Milestone\" title=\"What is a Project Milestone?\">What is a Project Milestone?<\/a><ul class=\"ez-toc-list-level-3\"><li class=\"ez-toc-heading-level-3\"><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management\/#Benefits_of_Using_Project_Milestones\" title=\"Benefits of Using Project Milestones\">Benefits of Using Project Milestones<\/a><\/li><li class=\"ez-toc-page-1 ez-toc-heading-level-3\"><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management\/#Examples_of_Project_Milestones\" title=\"Examples of Project Milestones\">Examples of Project Milestones<\/a><\/li><li class=\"ez-toc-page-1 ez-toc-heading-level-3\"><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management\/#Best_Practices_for_Creating_Project_Milestones\" title=\"Best Practices for Creating Project Milestones\">Best Practices for Creating Project Milestones<\/a><\/li><\/ul><\/li><li class=\"ez-toc-page-1 ez-toc-heading-level-2\"><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management\/#Conclusion\" title=\"Conclusion\">Conclusion<\/a><ul class=\"ez-toc-list-level-3\"><li class=\"ez-toc-heading-level-3\"><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management\/#Also_Read\" title=\"Also Read\">Also Read<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 id=\"what-is-a-project-milestone\" class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_is_a_Project_Milestone\"><\/span>What is a Project Milestone?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.incimages.com\/uploaded_files\/image\/1920x1080\/getty_180152187_970679970450036_92716.jpg\" alt=\"Project Management\"\/><\/figure>\n\n\n\n<p>A milestone can be described as an important phase or a specific point in the project\u2019s lifecycle which helps determine the project&#8217;s progress. The project milestones play a vital role as they display the key events of your project and help project managers to outline the project&#8217;s progress. Apart from being used as an effective way of measuring progress, project milestones also work as great boosters, especially when you have projects lasting for a couple of months.&nbsp;<\/p>\n\n\n\n<p>Remember that project milestones are not as same as your project tasks. A milestone usually refers to deliverable due dates, midpoint progress checks, start and end dates, project phases, etc.&nbsp;<\/p>\n\n\n\n<h3 id=\"benefits-of-using-project-milestones\" class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Benefits_of_Using_Project_Milestones\"><\/span>Benefits of Using Project Milestones<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Here are some of the key benefits of using project milestones.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Monitor Deliverable Deadlines Easily<\/strong> \u2013 Every project has its share of deadlines, and keeping a track of these deadlines can sometimes be overwhelming. One way to stay on top of them is to turn these deadlines into project milestones. This is beneficial for the project manager as well as the team members as they will have a high-level view of all the key dates and deliverables. Make sure to recognize the milestone to instill a sense of achievement within the team.&nbsp;<\/li><li><strong>Project Schedule<\/strong> \u2013 Apart from the deliverable deadlines, a project manager also needs to stay up to date on various other key dates that can impact the project. For example, you might be expected to attend a board meeting, or the entire team is scheduled for mandatory training, etc. By highlighting such key dates into milestones, it will enable project managers to look for workarounds early on so that the project is not impacted in any way.<\/li><li><strong>Identify Project Bottlenecks<\/strong> \u2013 There are several factors that will impact your project\u2019s progress; these factors can be internal and external. When it comes to external factors, such as client approval or receiving documents from the client, it is important to track them so that you can better prepare yourself and the team against any potential project bottlenecks.&nbsp;<\/li><\/ul>\n\n\n\n<h3 id=\"examples-of-project-milestones\" class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Examples_of_Project_Milestones\"><\/span>Examples of Project Milestones<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Typically, it is up to the project managers to define the items they want to capture and treat them as milestones. However, there are common project milestones that can help you if you are still new to the process of creating project milestones. Some of these examples include:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Project Approval<\/strong> \u2013 This is a key milestone that is achieved when the stakeholders and project sponsor sign off on the project plan and the statement of work. This indicates that the project is ready.<\/li><li><strong>Requirements Review<\/strong> \u2013 Before the work on the project begins, you need to gather all the requirements, document them, and get it reviewed by the project sponsor and stakeholders. This is an important milestone as achieving it means that you can now begin working on the project.<\/li><li><strong>Design Approval<\/strong> \u2013 If your project requires any type of design \u2013 website, graphic, product, etc., you can highlight the design approval as one of your project milestones.<\/li><li><strong>Project Phase Milestones<\/strong> \u2013 One good practice to follow is to set a milestone for each of your project phases, i.e., initiation, planning, execution, controlling, and closing. Setting these milestones will help you determine the progress being made and ensure that the project is ready for the next phase.<\/li><li><strong>Final Approval<\/strong> \u2013 Once the project is completely developed, it requires final approval from the stakeholders and project sponsor. This is another key milestone that should be highlighted.<\/li><\/ul>\n\n\n\n<h3 id=\"best-practices-for-creating-project-milestones\" class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Best_Practices_for_Creating_Project_Milestones\"><\/span>Best Practices for Creating Project Milestones<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Every project is different, and what works for one project manager may not work for another. Hence, there is no definite way to create and set project milestones. However, there are some best practices that you can follow to ensure that your project milestones are effective.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Project Scope<\/strong> \u2013 Make sure that you establish the scope of the project before you start working on creating the project milestones. This is because you need to have a clear idea of the project goals and deliverables so that your milestones are aligned with them.<\/li><li>Project Planning Stage \u2013 It is recommended that project managers use the project planning stage to select their key project milestones. Having a discussion with the team during the project planning stage will ensure that everybody is on the same page and agrees to the chosen milestones. This can be later communicated to the stakeholders.<\/li><li>Project Requirements \u2013 When working on complex projects, it can be difficult for project managers to set all the milestones that will guide their project lifecycle. The best option would be to use the project requirements and priorities. You can check the requirements to outline the key requirements and set your milestones against them.<\/li><li>Project Lifecycle \u2013 While setting up the project milestones, ensure that they are spread across the project&#8217;s lifecycle. So, milestones at the project&#8217;s beginning, middle, and end are preferred. This will help you remain on track and have visibility over the project right from the start to the end.<\/li><li>Project Progress \u2013 As your project progresses, several changes may be made from what was initially decided. If that is the case, you must adjust your project milestones accordingly.<\/li><li><strong>Project Management System<\/strong> \u2013 Project management systems have become quite common today, so make the best use of them by setting up a dashboard in the system to track, manage, and monitor your project milestones.&nbsp;<\/li><\/ul>\n\n\n\n<h2 id=\"conclusion\" class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span>Conclusion<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Setting up project milestones is beneficial in several ways, from helping project managers track and monitor the progress being made to keeping the team members motivated. Creating and setting up project milestones should be treated as checkpoints that will ensure their timely and successful completion. Today, there are several <a href=\"https:\/\/www.saasworthy.com\/list\/project-management-software\" class=\"ek-link\">project management software<\/a> that makes it really easy for project managers to not just set their project milestones based on the project but also track and monitor them.<\/p>\n\n\n\n<p>You can check out some of the top project management software on <a href=\"https:\/\/www.saasworthy.com\/\">SaaSworthy<\/a>!<\/p>\n\n\n\n<h3 id=\"also-read\" class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Also_Read\"><\/span><strong>Also Read<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/dev.saasworthy.com\/bloga-detailed-guide-on-effectively-collecting-user-feedback-in-mobile-application\">A Detailed Guide on Effectively Collecting User Feedback in Mobile Application<\/a><\/li><li><a href=\"https:\/\/dev.saasworthy.com\/blogproject-management-statistics\">Top Project Management Statistics to know in 2023<\/a><\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Here is a detailed guide on various key milestones in project management, their benefits, best practices for creating project milestones, and more. <\/p>\n","protected":false},"author":11,"featured_media":12868,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_editorskit_title_hidden":false,"_editorskit_reading_time":4,"_editorskit_is_block_options_detached":false,"_editorskit_block_options_position":"{}","footnotes":""},"categories":[196],"tags":[206],"class_list":{"0":"post-12866","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-guides","8":"tag-guides"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>A Detailed Guide on Key Milestones in Project Management - SaaSworthy Blog | Top Software, Statistics, Insights, Reviews &amp; Trends in SaaS<\/title>\n<meta name=\"description\" content=\"Here is a detailed guide on various key milestones in project management, their benefits, best practices for creating project milestones, and more.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"A Detailed Guide on Key Milestones in Project Management - SaaSworthy Blog | Top Software, Statistics, Insights, Reviews &amp; Trends in SaaS\" \/>\n<meta property=\"og:description\" content=\"Here is a detailed guide on various key milestones in project management, their benefits, best practices for creating project milestones, and more.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management\" \/>\n<meta property=\"og:site_name\" content=\"SaaSworthy Blog | Top Software, Statistics, Insights, Reviews &amp; Trends in SaaS\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/saasworthy\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-02-10T11:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-05T09:50:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dev.saasworthy.com\/blog\/wp-content\/uploads\/2023\/02\/pmHar.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Anjana\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@saasworthy\" \/>\n<meta name=\"twitter:site\" content=\"@saasworthy\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Anjana\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management\",\"url\":\"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management\",\"name\":\"A Detailed Guide on Key Milestones in Project Management - SaaSworthy Blog | Top Software, Statistics, Insights, Reviews &amp; Trends in SaaS\",\"isPartOf\":{\"@id\":\"https:\/\/dev.saasworthy.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management#primaryimage\"},\"image\":{\"@id\":\"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management#primaryimage\"},\"thumbnailUrl\":\"https:\/\/dev.saasworthy.com\/blog\/wp-content\/uploads\/2023\/02\/pmHar.jpg\",\"datePublished\":\"2024-02-10T11:00:00+00:00\",\"dateModified\":\"2024-08-05T09:50:49+00:00\",\"author\":{\"@id\":\"https:\/\/dev.saasworthy.com\/blog\/#\/schema\/person\/952b74d1e33591555ac4b72cbeac2ffe\"},\"description\":\"Here is a detailed guide on various key milestones in project management, their benefits, best practices for creating project milestones, and more.\",\"breadcrumb\":{\"@id\":\"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management#primaryimage\",\"url\":\"https:\/\/dev.saasworthy.com\/blog\/wp-content\/uploads\/2023\/02\/pmHar.jpg\",\"contentUrl\":\"https:\/\/dev.saasworthy.com\/blog\/wp-content\/uploads\/2023\/02\/pmHar.jpg\",\"width\":1280,\"height\":720},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/dev.saasworthy.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"A Detailed Guide on Key Milestones in Project Management\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/dev.saasworthy.com\/blog\/#website\",\"url\":\"https:\/\/dev.saasworthy.com\/blog\/\",\"name\":\"SaaSworthy Blog\",\"description\":\"Stay ahead in the SaaS industry with top software insights, latest statistics, and more. Explore the SaaSworthy Blog to choose the best SaaS solutions for your business.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/dev.saasworthy.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/dev.saasworthy.com\/blog\/#\/schema\/person\/952b74d1e33591555ac4b72cbeac2ffe\",\"name\":\"Anjana\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/dev.saasworthy.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1df5559c5f6fadef3976ba362ce0ad6a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1df5559c5f6fadef3976ba362ce0ad6a?s=96&d=mm&r=g\",\"caption\":\"Anjana\"},\"url\":\"https:\/\/dev.saasworthy.com\/blog\/author\/anjana\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"A Detailed Guide on Key Milestones in Project Management - SaaSworthy Blog | Top Software, Statistics, Insights, Reviews &amp; Trends in SaaS","description":"Here is a detailed guide on various key milestones in project management, their benefits, best practices for creating project milestones, and more.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management","og_locale":"en_US","og_type":"article","og_title":"A Detailed Guide on Key Milestones in Project Management - SaaSworthy Blog | Top Software, Statistics, Insights, Reviews &amp; Trends in SaaS","og_description":"Here is a detailed guide on various key milestones in project management, their benefits, best practices for creating project milestones, and more.","og_url":"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management","og_site_name":"SaaSworthy Blog | Top Software, Statistics, Insights, Reviews &amp; Trends in SaaS","article_publisher":"https:\/\/www.facebook.com\/saasworthy\/","article_published_time":"2024-02-10T11:00:00+00:00","article_modified_time":"2024-08-05T09:50:49+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/dev.saasworthy.com\/blog\/wp-content\/uploads\/2023\/02\/pmHar.jpg","type":"image\/jpeg"}],"author":"Anjana","twitter_card":"summary_large_image","twitter_creator":"@saasworthy","twitter_site":"@saasworthy","twitter_misc":{"Written by":"Anjana","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management","url":"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management","name":"A Detailed Guide on Key Milestones in Project Management - SaaSworthy Blog | Top Software, Statistics, Insights, Reviews &amp; Trends in SaaS","isPartOf":{"@id":"https:\/\/dev.saasworthy.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management#primaryimage"},"image":{"@id":"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management#primaryimage"},"thumbnailUrl":"https:\/\/dev.saasworthy.com\/blog\/wp-content\/uploads\/2023\/02\/pmHar.jpg","datePublished":"2024-02-10T11:00:00+00:00","dateModified":"2024-08-05T09:50:49+00:00","author":{"@id":"https:\/\/dev.saasworthy.com\/blog\/#\/schema\/person\/952b74d1e33591555ac4b72cbeac2ffe"},"description":"Here is a detailed guide on various key milestones in project management, their benefits, best practices for creating project milestones, and more.","breadcrumb":{"@id":"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management#primaryimage","url":"https:\/\/dev.saasworthy.com\/blog\/wp-content\/uploads\/2023\/02\/pmHar.jpg","contentUrl":"https:\/\/dev.saasworthy.com\/blog\/wp-content\/uploads\/2023\/02\/pmHar.jpg","width":1280,"height":720},{"@type":"BreadcrumbList","@id":"https:\/\/dev.saasworthy.com\/blog\/key-milestones-in-project-management#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dev.saasworthy.com\/blog\/"},{"@type":"ListItem","position":2,"name":"A Detailed Guide on Key Milestones in Project Management"}]},{"@type":"WebSite","@id":"https:\/\/dev.saasworthy.com\/blog\/#website","url":"https:\/\/dev.saasworthy.com\/blog\/","name":"SaaSworthy Blog","description":"Stay ahead in the SaaS industry with top software insights, latest statistics, and more. Explore the SaaSworthy Blog to choose the best SaaS solutions for your business.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dev.saasworthy.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/dev.saasworthy.com\/blog\/#\/schema\/person\/952b74d1e33591555ac4b72cbeac2ffe","name":"Anjana","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/dev.saasworthy.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1df5559c5f6fadef3976ba362ce0ad6a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1df5559c5f6fadef3976ba362ce0ad6a?s=96&d=mm&r=g","caption":"Anjana"},"url":"https:\/\/dev.saasworthy.com\/blog\/author\/anjana"}]}},"_links":{"self":[{"href":"https:\/\/dev.saasworthy.com\/blog\/wp-json\/wp\/v2\/posts\/12866","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.saasworthy.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dev.saasworthy.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dev.saasworthy.com\/blog\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/dev.saasworthy.com\/blog\/wp-json\/wp\/v2\/comments?post=12866"}],"version-history":[{"count":4,"href":"https:\/\/dev.saasworthy.com\/blog\/wp-json\/wp\/v2\/posts\/12866\/revisions"}],"predecessor-version":[{"id":17062,"href":"https:\/\/dev.saasworthy.com\/blog\/wp-json\/wp\/v2\/posts\/12866\/revisions\/17062"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dev.saasworthy.com\/blog\/wp-json\/wp\/v2\/media\/12868"}],"wp:attachment":[{"href":"https:\/\/dev.saasworthy.com\/blog\/wp-json\/wp\/v2\/media?parent=12866"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dev.saasworthy.com\/blog\/wp-json\/wp\/v2\/categories?post=12866"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dev.saasworthy.com\/blog\/wp-json\/wp\/v2\/tags?post=12866"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}